24/7 EMERGENCY: +94 75 824 4216
SIX7 Plumbing logo SIX7 PLUMBING
WATERPROOFING

SIX7 Plumbing Waterproofing Colombo

Bathroom floors, roofs, balconies: prep, prime, coat, cure. Grout and tile-level sealing we do in-house; chemical injection and specialist membrane systems are quoted per m² and delivered to our spec.

Licensed & Insured 6-Month Warranty 60-Min ETA

MEMBRANE APPLICATION & TESTING

Quoted per m²

+ visit LKR 2,500 — Pay after approval

T&Cs apply — /pricing/ & /disclaimer/

Is this your problem?

  • Bathroom floor leaking to the ceiling below
  • Balcony ponding into the wall
  • Roof slab seeping after rain
  • Old grout lines weeping

Waterproofing fails at preparation, not at the product. Old grout, dust, trapped moisture and unfilled cracks turn expensive membranes into expensive paint. Our scope starts with stripping and prepping the surface, then the system: membrane or cementitious coat for slabs and balconies, tile-level regrouting and sealing for bathrooms where the substrate is sound.

Where the problem is structural — water moving through a slab from the other side — chemical injection systems are the right tool, and we quote them per m² with the cure schedule stated up front. Multi-visit by nature; the quote says how many visits and why.

MYTH BUSTED
MYTH

"Any paint can waterproof a surface."

REALITY

Waterproofing membranes are engineered products — paint is cosmetic, not structural.

FIELD NOTE

Balcony and bathroom waterproofing are the two most common jobs — both fail at the edges, not the center.

Cause

Skipping surface prep, using wrong membrane for the area, and poor application cause most waterproofing failures.

How We Fix It

Surface prep, correct membrane selection, proper application, flood test after curing.

PRO TIP

If your bathroom floor feels soft or spongy, the waterproofing may have failed. Get it checked before the tiles crack.

WHY NOW

Failed waterproofing damages ceilings, walls, and structural elements. Every month you wait adds to the repair cost.

FIELD PRINCIPLE

A flood test after the membrane sets is not optional — twenty-four hours of standing water proves what eyes cannot.

WHAT'S INCLUDED
Surface prep Correct membrane Proper application Flood test
6-Month Workmanship Shield After-Hours +40%
PRO TIPS

What to Do Before We Arrive

  • Stop using the shower or balcony until we look — a dry substrate tells us far more than a wet one.
  • Clear bottles, mats and furniture so the whole surface can be inspected.
  • Note where water appears relative to the wet area — leaks travel sideways before they drop.
  • If tiling is scheduled, tell us now — membrane work happens before tiles, never after.

EMERGENCY CONTACT

+94 75 824 4216

Available 24/7 — 365 days a year

WhatsApp Us

Request a Quote

Fill out the form below and we'll get back to you within 24 hours.

For emergencies, call +94 75 824 4216

Common Questions

Why per m² and not hourly?
Material volume and prep depth scale with area, not time; per-m² quotes keep the number fixed.
How many visits?
Membrane jobs need prep, coat and cure windows — the quote states the visit count before you commit.
Is this covered by the 6-month shield?
Our workmanship yes; membrane manufacturer warranties run separately and are handed over in writing.

RELATED SERVICES

Call Now WhatsApp